Terrenus Energy

SolarLand 2

Singapore's largest ground-mounted utility-scale solar farm

SolarLand 2

Mobile. Efficient. Sustainable.

TE was awarded SolarLand Phase 2 by JTC Corporation in January 2020 and the project was completed in November 2021. Operating near Changi Airport, SL2 makes use of state-of-the-art RE tech, including a first-of-its-kind containerised mobile substation which unlocks the near-instantaneous redeployment of the substation unit. The project also uses an advanced portable and compact mounting system, allowing a higher number of panels to be deployed. These configurations give SL2 one of the highest solar intensity profiles in the world — measured in watts per square-meter — and have led to a 60% increase in PV capacity, up to 19.2 MWp from the original tender capacity requirement of 12 MWp. Furthermore, unlike traditional solar systems, the improved design removes the need for ballast blocks to stabilise the arrays, resulting in huge cost savings from the steep drop in material and labour costs. This also means that the speed of installation and redeployment is greatly accelerated, enhancing mobility.

Other new industrial practices will be introduced such as drone-led cleaning and agrivoltaics (i.e., urban farming). To fully utilise every inch of space allocated for the project, suitable crops will be planted below the solar arrays through our community urban farming initiative that will run concurrently on-site. This versatile approach enables us to contribute to another target of the Singapore Green Plan 2030: food security.

Key Features:

Total of 19.2 MWp

23.9 GWh generated annually

equivalent to powering 5,350 4-room HDB flats for one entire year

536,700 trees planted

1,000 cars taken off the road

7,500 tonnes of carbon emissions reduced annually

Solar for SmallMediumLarge Business.

We complete every step carefully.

01

Free Consultation & Evaluation

Make an appointment with us! Upon analysing your site and consumption data, we will design an optimised solar PV system for your business.

02

Proposal & Agreement

Based on your energy needs, we will present you with a customised proposal. The contract is finalised and signed when you are happy with our offer.

03

System Installation

Installation is kept within 6-9 months*. We ensure the highest quality in system parts and workmanship.

*varies according to system size and authority approval times

04

O&M and Customer Aftercare

We operate and maintain the system for the full contract duration. In the event of any technical bumps, we aim to resolve them within a 48-hour benchmark.

Our Projects.Projects.

SolarLand 2

A total of 19.2 MWp capacity, compact and mobile system design and home of TE's first-of-its kind mobile substation Completion date: Nov 2021
Learn More

SolarLand 1 Extension

A total of 25 MWp capacity integrating four different RE generation sources for 24-hours baseload and one of the highest solar intensity profiles in the world. Completion date: 2022 to 2024
Learn More

Commercial Projects

Powering over 300 businesses across South Australia and Queensland with the sun’s rays
Learn More

Upcoming Projects

Learn More

Other Projects.Projects.

SolarLand 1 - Singapore's first utility-scale solar farm

A total of 5.3 MWp capacity, using a "plug-and-play" mounting system for easier installation. Completion date: June 2019
Learn More

SolarLand 1 Extension - World's first 4-in-1 renewable energy facility

A total of 25 MWp capacity integrating four different RE generation sources for 24-hours baseload and one of the highest solar intensity profiles in the world. Completion date: 2022 to 2024
Learn More

Rooftop Solar

Powering over 300 businesses across South Australia and Queensland with the sun’s rays
Learn More

Power up your business

We offer solar plans tailored for small, medium, and large businesses. Harness the sun’s rays to generate green energy and lots and lots of power savings.​

Visit our commercial website to learn more.​

SolarLand 2

Singapore's largest ground-mounted utility-scale solar farm

SolarLand 2

(Terrenus Energy SL2 Pte. Ltd)

Mobile. Efficient. Sustainable.

TE was awarded SolarLand Phase 2 by JTC Corporation in January 2020 and the project was completed in November 2021. Operating near Changi Airport, SL2 makes use of state-of-the-art RE tech, including a first-of-its-kind containerised mobile substation which unlocks the near-instantaneous redeployment of the substation unit. The project also uses an advanced portable and compact mounting system, allowing a higher number of panels to be deployed. These configurations give SL2 one of the highest solar intensity profiles in the world — measured in watts per square-meter — and have led to a 60% increase in PV capacity, up to 19.2 MWp from the original tender capacity requirement of 12 MWp. Furthermore, unlike traditional solar systems, the improved design removes the need for ballast blocks to stabilise the arrays, resulting in huge cost savings from the steep drop in material and labour costs. This also means that the speed of installation and redeployment is greatly accelerated, enhancing mobility.

Other new industrial practices will be introduced such as drone-led cleaning and agrivoltaics (i.e., urban farming). To fully utilise every inch of space allocated for the project, suitable crops will be planted below the solar arrays through our community urban farming initiative that will run concurrently on-site. This versatile approach enables us to contribute to another target of the Singapore Green Plan 2030: food security.

Key Features:

Total of 19.2 MWp

23.9 GWh generated annually

equivalent to powering 5,350 4-room HDB flats for one entire year

536,700 trees planted

1,000 cars taken off the road

7,500 tonnes of carbon emissions reduced annually

Solar for SmallMediumLarge Business.

We complete every step carefully.

01

Free Consultation & Evaluation

Make an appointment with us! Upon analysing your site and consumption data, we will design an optimised solar PV system for your business.

02

Proposal & Agreement

Based on your energy needs, we will present you with a customised proposal. The contract is finalised and signed when you are happy with our offer.

03

System Installation

Installation is kept within 6-9 months*. We ensure the highest quality in system parts and workmanship.

*varies according to system size and authority approval times

04

O&M and Customer Aftercare

We operate and maintain the system for the full contract duration. In the event of any technical bumps, we aim to resolve them within a 48-hour benchmark.

Our Projects.Projects.

SolarLand 2

A total of 20MWp with higher capacity and sleeker design Completed on October 2021.
Learn More

SolarLand 1 Extension

A total of 25MWp. Integrated renewable energy facility, 24-hour baseload. Completion date is Mid-2022.
Learn More

Commercial Projects

Powering over 300 businesses across South Australia and Queensland with the sun’s rays
Learn More

Upcoming Projects

Learn More

Our Projects.Projects.

SolarLand 1 - Singapore's largest ground-mounted utility-scale solar farm

A total of 19.2 MWp capacity, compact and mobile system design and home of TE's first-of-its kind mobile substation Completion date: Nov 2021
Learn More

SolarLand 1 Extension - World's first 4-in-1 renewable energy facility

A total of 25 MWp capacity integrating four different RE generation sources for 24-hours baseload and one of the highest solar intensity profiles in the world. Completion date: 2022 to 2024
Learn More

Rooftop Solar

Powering over 300 businesses across South Australia and Queensland with the sun’s rays
Learn More

Power up your business

We offer solar plans tailored for small, medium, and large businesses. Harness the sun’s rays to generate green energy and lots and lots of power savings.​

Visit our commercial website to learn more.​

SolarLand 2

Singapore's largest ground-mounted utility-scale solar farm

SolarLand 2

Mobile. Efficient. Sustainable.

TE was awarded SolarLand Phase 2 by JTC Corporation in January 2020 and the project was completed in November 2021. Operating near Changi Airport, SL2 makes use of state-of-the-art RE tech, including a first-of-its-kind containerised mobile substation which unlocks the near-instantaneous redeployment of the substation unit. The project also uses an advanced portable and compact mounting system, allowing a higher number of panels to be deployed. These configurations give SL2 one of the highest solar intensity profiles in the world — measured in watts per square-meter — and have led to a 60% increase in PV capacity, up to 19.2 MWp from the original tender capacity requirement of 12 MWp. Furthermore, unlike traditional solar systems, the improved design removes the need for ballast blocks to stabilise the arrays, resulting in huge cost savings from the steep drop in material and labour costs. This also means that the speed of installation and redeployment is greatly accelerated, enhancing mobility.

Other new industrial practices will be introduced such as drone-led cleaning and agrivoltaics (i.e., urban farming). To fully utilise every inch of space allocated for the project, suitable crops will be planted below the solar arrays through our community urban farming initiative that will run concurrently on-site. This versatile approach enables us to contribute to another target of the Singapore Green Plan 2030: food security.

Key Features:

Total of 19.2 MWp

23.9 GWh generated annually

equivalent to powering 5,350 4-room HDB flats for one entire year

536,700 trees planted

1,000 cars taken off the road

7,500 tonnes of carbon emissions reduced annually

Solar for SmallMediumLarge Business.

We complete every step carefully.

01

Free Consultation & Evaluation

Make an appointment with us! Upon analysing your site and consumption data, we will design an optimised solar PV system for your business.

02

Proposal & Agreement

Based on your energy needs, we will present you with a customised proposal. The contract is finalised and signed when you are happy with our offer.

03

System Installation

Installation is kept within 6-9 months*. We ensure the highest quality in system parts and workmanship.

*varies according to system size and authority approval times

04

O&M and Customer Aftercare

We operate and maintain the system for the full contract duration. In the event of any technical bumps, we aim to resolve them within a 48-hour benchmark.

Our Projects.Projects.

SolarLand 2

A total of 20MWp with higher capacity and sleeker design Completed on October 2021.
Learn More

SolarLand 1 Extension

A total of 25MWp. Integrated renewable energy facility, 24-hour baseload. Completion date is Mid-2022.
Learn More

Commercial Projects

Powering over 300 businesses across South Australia and Queensland with the sun’s rays
Learn More

Upcoming Projects

Learn More

Other Projects.Projects.

SolarLand 1 - Singapore's first utility-scale solar farm

A total of 5.3 MWp capacity, using a "plug-and-play" mounting system for easier installation. Completion date: June 2019
Learn More

SolarLand 1 Extension - World's first 4-in-1 renewable energy facility

A total of 25 MWp capacity integrating four different RE generation sources for 24-hours baseload and one of the highest solar intensity profiles in the world. Completion date: 2022 to 2024
Learn More

Rooftop Solar

Powering over 300 businesses across South Australia and Queensland with the sun’s rays
Learn More

Power up your business

We offer solar plans tailored for small, medium, and large businesses. Harness the sun’s rays to generate green energy and lots and lots of power savings.​

Visit our commercial website to learn more.​